Shrink Entry is part of the PRODUCE™ module and is available when PRODUCE is enabled for your account.
Recording a Shrink Event
Select the job
Use Select job (recipe, lot) to find the production job. Jobs are listed by job number, plant description, and production plan, and only active lots are shown.
Fill in the event
- Shrink Type (required): Disease, Overproduction, Quality Issue, Environmental, or Other
- Quantity Lost (required): whole units — a built-in calculator is available for quick math
- Date (required): defaults to today
- Notes: optional, except when the type is Other — then notes are required
Yield Summary
With a job selected, the page shows the job’s running scoreboard:- Expected — the job’s planned output
- Actual — the actual yield to date
- Variance — actual minus expected, shown in red when negative